Place 9 wide strips of roll roofing along the eaves and rakes positioning them to overhang the deck to 3 8.
Mineral roll roofing installation.
Place a 9 229 mm wide starter strip along eave and rake edges so it overhangs the drip edge 1 4 6 3 mm.
Mineral guard roll roofing can be installed following either the horizontal method parallel to the eaves or the vertical method parallel to the rakes.
Things you ll need rolled roofing razor knife trowel brush hose measuring tape ladder roofing cement 1 inch 2 5 cm long roofing nails hammer chalk.
See figure 1 roll roofing installation.
Fasten the strips with rows of nails located 1 and 8 from the roof edge and spaced 4 on center in each row.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.